Specialist Services // Gas Testing Facility
Hirst Electrical recently installed a Gas supply and Booster with a capacity of 5MW at their Wakefield Works.
Initially this was used to Commission Generators that Hirst Electrical had previously built. However the facility has proved to be a great success with External Customers.
Hirst Electrical offer the following:
- Test Pad Area 20mts x 10mts
- Gas Capacity to 5MW
- Gas Booster
- Low Voltage Distribution System for Auxillary Equipment
- Lifting Facilities
- Resistive Reactive Loadbanks
- Bunded Tanks for Oil and Glycol
- Commissioning Engineer
The most recent test was a 2MW Bi-Fuel Diesel running in parralell with a 1.4MW Gas Engine . This package was built, tested and then shipped to a site Nr Cairo in Egypt. The units were installed and commissioned on site through Hirst Electrical's Electrical and Mechanical Division. |